Skip to content
MRHB Shariah Certified0.0197g Gold / BKG · Dual-Regulated Vaulting

Sovereign Gold, engineered for the chain.

Bober Khan Wealth Holdings tokenizes audited physical bullion with 0.0197g pure gold per BKG, powered by 3Zero EcoMining™ (zero water, zero cyanide), dual-custody vaulting (FINMA Switzerland & SC Malaysia), and Mudarabah yield profit-sharing.

BKG SEED ROUND$0.05+25% Bonus
Gold Spot (XAU)$4,400/oz
Gold Per Token0.0197g
Dual-Regulated CustodyFINMA & SC Malaysia
Taurus-PROTECT (Switzerland)Gambit Custody (Malaysia)
Multi-Mine ConcessionsNevada · Madagascar · Romania
$523.95B
Concession 01: PSV Nevada2,600 TPD Full Design Capacity
Mudarabah & Shariah MoatMRHB Certified

1–25% Operational Profit Share distributed in physical gold. Zero riba, zero gharar, with on-chain Digital Sukuk token architecture.

SCROLL
0.0197g100% Backed
Gold Entitlement Per BKG Token
4.0 BillionNon-Dilutive
BKG Fixed Total Supply Cap
MRHB CertifiedHalal Gold
Shariah Compliant Mudarabah Architecture
Dual-RegulatedAudited Vaults
Taurus (FINMA, CH) + Gambit (SC Malaysia)
1–25%Gold Yield
Mudarabah Operational Profit Sharing
0 LitresZero Water
Water Consumption (EDMSU Dry Process)
0 TonnesZero Cyanide
Cyanide Used (PCE Electrochemistry)
77 MPaZero Waste
Sulbet Polymer Concrete (Exceeds C55)
$523.95BAnchor Mine
PSV Nevada Concession Asset Base
0.0197g100% Backed
Gold Entitlement Per BKG Token
4.0 BillionNon-Dilutive
BKG Fixed Total Supply Cap
MRHB CertifiedHalal Gold
Shariah Compliant Mudarabah Architecture
Dual-RegulatedAudited Vaults
Taurus (FINMA, CH) + Gambit (SC Malaysia)
1–25%Gold Yield
Mudarabah Operational Profit Sharing
0 LitresZero Water
Water Consumption (EDMSU Dry Process)
0 TonnesZero Cyanide
Cyanide Used (PCE Electrochemistry)
77 MPaZero Waste
Sulbet Polymer Concrete (Exceeds C55)
$523.95BAnchor Mine
PSV Nevada Concession Asset Base
0.0197g100% Backed
Gold Entitlement Per BKG Token
4.0 BillionNon-Dilutive
BKG Fixed Total Supply Cap
MRHB CertifiedHalal Gold
Shariah Compliant Mudarabah Architecture
Dual-RegulatedAudited Vaults
Taurus (FINMA, CH) + Gambit (SC Malaysia)
1–25%Gold Yield
Mudarabah Operational Profit Sharing
0 LitresZero Water
Water Consumption (EDMSU Dry Process)
0 TonnesZero Cyanide
Cyanide Used (PCE Electrochemistry)
77 MPaZero Waste
Sulbet Polymer Concrete (Exceeds C55)
$523.95BAnchor Mine
PSV Nevada Concession Asset Base

The Innovators Behind 3Zero EcoMining™

Uniting world-class electrochemical inventors, institutional resource asset managers, and operational mining engineers across Singapore, Poland, and the United States.

BK

Bober Khan

Founder & Group Chairman

Chairman of Bober Khan Wealth Holdings (BKWH). Architect of the 3Zero EcoMining platform and assignee of the Osman Digital Twin Patent (WO2015/142160).

MG

Michał Gieroń

Chief Inventor & Technology Licensor

Pioneer in Potential-Controlled Electrolysis (PCE) and electrochemical metallurgy. Founder of NANO TECH SP Z O O and PCE Brain Trust (Poland).

BT

BKW Tech Engineering

Metallurgical Technology Division

Engineering consortium overseeing the containerized deployment of EDMSU dry separation, PCE refineries, and Sulbet polymer concrete units.

PN

PSV Nevada Leadership

Nevada Project Operator

Operational leadership team driving the Vander and Lincoln 1 mines from 100 TPD to 2,600 TPD design throughput under US GAAP rigor.

INSTITUTIONAL GRADE DIGITAL GOLD

Secure Your Claim on Sovereign Physical Gold

Join institutional investors, treasury managers, and individuals holding blockchain-native gold backed 100% by audited bullion in regulated global vaults.

VERIFIED SMART CONTRACT (ETHEREUM):0x3F8aD19a27c09E973bA613E994B69Ac3f08B9B1E